St. Peter's London Docks CofE Primary School in London

Location: London E1W3

Scope of works: Floor plans, Roof plans, Loft, Sections, External elevation drawings and Topo (full site plan with levels)

Timeframe: 2 day on-site, drawings ready within 12 working days

Existing plan

Existing plan

Existing roof plan

Existing roof plan

Existing site plan

Existing site plan