Information reviewed: 16 November 2026

Choose the survey output around the work the design team must do. A well-specified set of CAD drawings can be sufficient for a straightforward alteration. A coordinated Revit model can be valuable where multiple floors, complex geometry or several disciplines must work together. Neither is automatically better for every refurbishment. Compare our CAD extraction and Scan to BIM services against the actual brief.

Cad revit workflow — illustration
Illustrative view: cad revit workflow.

Begin with the decisions, not the software

Ask the architect and engineer which views they need, which interfaces are difficult and how they will exchange revisions. If the team works primarily in 2D and needs a limited number of plans and sections, a native model may add little immediate value. If many coordinated views and spatial checks are needed, maintaining separate drawings can become cumbersome.

Project situation Likely useful starting point Important qualification
Simple extension with a defined drawing set Coordinated 2D plans, elevations and sections Include the relevant external context and levels
Complex roof or multi-level refurbishment Existing-condition BIM or targeted 3D geometry Specify irregularity and inaccessible areas
Multi-discipline coordination Agreed model and exchange workflow Check what the other teams can actually use
Budget-limited early feasibility Focused CAD or simplified model Record what must be added before later decisions
Mixed consultant software Native output plus agreed exchange files Test a representative exchange before full production

This is a decision aid, not a rigid rule. A small building can have a difficult junction, and a large building can have a simple initial information requirement.

When CAD is a strong choice

CAD works well when the required drawing set is clear. Agree floor plans, section positions, elevations, levels and any detail drawings. Consistent layers, units and references make the package easier for the designer to reuse.

The main risk is incomplete coordination between separately maintained views. If a section reveals a floor-level change, that relationship must remain consistent with the plans. A drawing review should test those connections rather than only checking graphic appearance. Our DWG/DXF Viewer can help stakeholders inspect the issued drawings.

When BIM earns its place

A model can support repeated sections, spatial understanding and coordination across disciplines. Its value depends on how it is built and used. A model full of generic objects and unverified assumptions may give a misleading impression of certainty.

Agree the elements, purpose, software version, coordinates and treatment of hidden construction. If the team needs to coordinate around a bowed wall or sloping roof, define how faithfully those features must be represented. The LOD and accuracy guide explains why a single development label is not a complete brief.

Plans sections elevations — illustration
Illustrative view: plans sections elevations.

A hybrid workflow can be practical

One option is to capture an agreed point cloud, deliver the immediate CAD package and model selected areas later. Another is to author a coordinated model and issue only the drawings and exchanges required by each recipient. Neither option is automatically cheaper; compare the total expected work and revision process.

Later modelling depends on the adequacy and availability of the captured data. A cloud cannot supply a concealed feature or an area that was never observed. Agree retention, access rights and likely later requirements at the first appointment.

What 2D-to-3D conversion can and cannot do

Converting old drawings into a model can improve presentation and coordination of the information they contain. It does not verify that the drawings match the building. Missing heights, conflicting revisions and unknown roof geometry remain unresolved unless checked against reliable evidence.

Keep the source and status of converted geometry explicit. If the project needs an existing-condition survey model, distinguish measured information from drawing-derived assumptions. That distinction is particularly important where design decisions depend on clearances or structural interfaces.

Compare total project effort

Ask for quotations against the same extent and intended use. Compare capture, drawing or model production, checking, required exports and revision allowances. Avoid assuming a fixed percentage saving from either workflow.

For a relevant example, see the Canary Wharf mixed-use project and our as-built drawing service. Agree whether “as-built” means a record of the existing surveyed condition or verification of completed construction at a particular date.

Building services model — illustration
Illustrative view: building services model.

Frequently asked questions

Can I use a BIM model for a planning application?

The model may support preparation of the required drawings, but the application needs the specified submission documents. Confirm the drawing requirements with the designer and authority.

Should every consultant receive the native Revit file?

Only if it fits the agreed workflow and permissions. Some recipients need controlled drawings or an exchange model instead. Avoid distributing unnecessary versions that later become inconsistent.

What should I request first?

Send the intended uses and receiving software, together with a drawing list or model element brief. Ask for options where the most efficient workflow is still undecided.

Practical commissioning guidance reviewed on 16 November 2026. The agreed appointment defines the scope and deliverables.