Information reviewed: 16 November 2026
A residential measured survey gives your design team a coordinated record of the existing house and the agreed external areas. It can support an extension, loft conversion, basement proposal or full refurbishment. The right scope depends on the proposed work: a room layout alone rarely answers questions about roof geometry, garden levels or adjacent buildings. Our measured building survey service covers the core capture and drawing options.

Choose the survey around the proposed work
| Project | Information to discuss before booking |
|---|---|
| Rear or side extension | Existing plans, relevant elevations, section through the connection, garden and threshold levels |
| Loft conversion | Roof shape, accessible loft geometry, stair relationship, ridge and eaves levels |
| Basement proposal | Existing basement and ground floors, adjoining visible geometry, external levels and engineer-selected sections |
| Full refurbishment | All relevant floors, service positions where specified, vertical relationships and coordinated CAD or BIM |
The table is a briefing aid, not a substitute for an architect’s or engineer’s instructions. A project may need several of these scopes. If the design is undecided, identify the likely options so that useful external context is not omitted at the first visit.
Extensions: record the connection as well as the footprint
A rear extension depends on how the new space meets the existing house. Thresholds, changes in floor level, windows above the proposed roof and neighbouring ground can matter more than a simple garden outline. Ask the designer which sections will test those relationships.
Our house extension planning guide explains the separate planning questions. Existing survey drawings record current conditions; proposed drawings show the designer’s solution. Neither a scan nor an existing plan is planning permission.
Lofts: useful headroom needs a connected section
Agree access to the loft, any safe working restrictions and the required record of visible roof structure. A drawing should make clear where a surface was observed and where geometry was inaccessible. Insulation, storage and finishes can obstruct parts of the roof.
For early design, a section connecting the proposed stair route, ceiling and roof can be more useful than extra isolated dimensions. Structural adequacy and concealed member sizes require the engineer’s assessment and, where necessary, separate investigation. Read the loft conversion guide alongside the survey brief.
Basements: a measured survey is one part of the evidence
Basement projects may require topographical information, ground investigation, structural design, drainage assessment and borough-specific submissions. Scanning does not reveal foundation depth or groundwater. Ask the engineer to mark required sections and levels before the visit.
Our basement and BIA survey guide sets out which measurements support the wider assessment and which tasks need separate specialists. If gardens, lightwells or external drainage levels matter, include a topographical survey in the coordinated scope rather than commissioning unrelated drawings with different datums.

Match information to the design stage
RIBA stages describe a project workflow; they do not prescribe one universal survey package. During preparation and briefing, the team may need enough information to test feasibility. Concept and spatial coordination generally require better-resolved relationships between floors, façades and the site. Technical design can introduce local interfaces requiring closer verification.
Agree which decisions are being made now and which may follow. Requesting fabrication detail across an entire house at feasibility stage can create unnecessary work. Conversely, a simplified sketch survey may be a poor foundation for a complex refurbishment. Our CAD versus BIM guide helps decide the appropriate output.
What to prepare for the visit
- Confirm keys, occupants and access to every room in scope.
- Identify loft hatches, basements, outbuildings and restricted areas.
- Tell us about known hazards and fragile finishes.
- Arrange access to neighbouring land only where permission has been obtained.
- Mark the external extent and any critical section lines on a plan.
- Confirm required formats, drawing units and the architect’s preferred model version.
Please do not move unsafe materials or enter hazardous spaces to prepare for the survey. Access limitations should be recorded and resolved through an agreed safe approach.
Residential project examples
See the semi-detached house in SW19, Pinner property in HA5, SW1X townhouse and Victorian property in E12. Use these to discuss comparable outputs, not as evidence that your house has identical conditions.

Frequently asked questions
Is this the survey I need before buying a house?
If your main concern is condition, repairs or defects, a RICS Home Survey may be more appropriate. A measured survey supplies geometry for design. The Home Survey comparison explains when both may be useful.
Can the house remain occupied?
Discuss occupancy at quotation stage. Clear access and a practical room sequence help, but the safe working method and any temporary restrictions depend on the site.
What will it cost?
The survey cost page explains the main factors. Request a residential survey quotation with your address, project type, available plans and required deadline for a confirmed scope and fee.
References and review date
References checked on 16 November 2026. Requirements can change; confirm the applicable edition and project-specific requirements when appointing the team.

